OEM sheet metal manufacturing · Dongguan, Chinasales01@xinghaoxin.comTalk to our team ↗

SERVICES

How we work
with your team.

An enclosure project fails in the gaps: the drawing nobody questioned, the quantity nobody could commit to, the finish that was never specified. Most of what follows exists to close those gaps before they cost you money.

Free DFM review · MOQ from 1 piece · reply within 2 hours

Sheet metal workshop with racking, press brake and welded cabinet frames

What every project gets

Six things
you can hold us to.

Guangdong Xinghaoxin Technology Co., Ltd.

Engineer checking an enclosure on the bench beside the machine it has to fit

A review before you commit

  • Drawing read against the equipment and the installation
  • Findings returned with the quotation, at no charge
  • Open questions listed in writing, never assumed
  • Material and finish proposed against the real exposure
Digital caliper measuring the wall of a formed enclosure

One factory, one tolerance

  • Cutting, forming and joining under one roof
  • In-house surface treatment and assembly
  • Inspection in the same building as the build
  • One owner of the tolerance, not six suppliers
Finished parts taped and labelled for dispatch beside the documentation pack

Answers in hours, not days

  • 12 hours a day, 6 days a week
  • Reply within one working day on average
  • One engineer from RFQ through to dispatch
  • Batch status available while the order runs

An entry quantity that makes sense

  • One piece minimum, with no tooling charge
  • 1–10 pieces for a pilot build
  • 10–100 pieces for a trial run
  • Repeat orders on the same approved drawing

Terms you can plan around

  • Quoted in USD
  • EXW, FOB, CIF or DDP
  • Deposit on order, balance against the pre-shipment report
  • MOQ from one piece

Documents and packing handled

  • Dimensional report against the approved drawing
  • Material certificates and certificate of origin
  • Protective packing for sea or air
  • Nine packing methods, from bagged parts to wooden crates

HOW A PROJECT RUNS

Six steps from
drawing to shipment.

Each step has an owner and something you receive at the end of it, so you always know what is being decided and what is waiting on you.

01 / BRIEF

Drawings & requirements

Send 2D or 3D files, or a sample to reverse-engineer, with material, finish, quantity and the installation conditions. A marked-up sketch is enough to start.

You send: files, quantity, application, target date

02 / REVIEW

DFM review & quotation

Engineering reviews the build, returns the findings and prices the agreed scope. Open questions are listed rather than assumed.

You receive: DFM findings, open questions, price

03 / APPROVAL

First-off sample

A first-off sample confirms dimensions, fit, finish and assembly before volume production starts. It is held until you sign it off.

You receive: sample, dimensional report

04 / BUILD

Production & finishing

Cutting, forming, welding, surface treatment and assembly, with in-process inspection as the batch progresses rather than only at the end.

You receive: batch status, in-process measurements

05 / CHECK

Final inspection & documentation

Key dimensions, surface finish and assembly inspected against the approved drawing. Reports are archived and the pack is issued before dispatch.

You receive: final report, certificates, origin

06 / SHIP

Packing & delivery

Protective packing for sea or air freight, export documentation and shipment coordination on the incoterm you specified.

You receive: shipping documents, tracking

How a cabinet is packed

Six ways a cabinet leaves the building, chosen by what it is, how far it travels and whether the face has to arrive unmarked.

Foam-lined wooden crate — A cabinet lowered into a plywood crate lined with foam
Foam-lined wooden crate
Banded export crate — Crate closed, steel-strapped and marked for the destination
Banded export crate
Pallet and stretch wrap — Cabinets stacked on a timber pallet and wrapped
Pallet and stretch wrap
EPE foam and pearl cotton — Corner protection taped on before the crate is closed
EPE foam and pearl cotton
Five-ply carton — Panels and doors cartoned with paper between the faces
Five-ply carton
Container loading — Crates and wrapped units loaded at the dock
Container loading

WHAT WE NEED FROM YOU

Four things,
and we can start.

The fastest projects are the ones where these arrive together. If some are still open, send what you have — engineering will tell you what is missing and what each gap changes.

There is no template to fill in and no portal to register on. A drawing and a paragraph of context is a workable start.

To quote

Drawings or dimensions, material and thickness, finish and colour, quantity, and the incoterm you buy on. A marked-up sketch or a sample works if there is no drawing yet.

To build well

The installation conditions — indoor or outdoor, dust and moisture, temperature, chloride or chemical exposure, and any NEMA or IP target. This decides the material and the sealing detail.

To avoid surprises

The dimensions you will actually measure on receipt, and which surfaces are judged cosmetically. Inspection criteria are agreed against those, not against every dimension on the drawing.

To keep your design private

An NDA, if your policy needs one. Send yours and we return a countersigned copy. Drawings are used only to build your parts.

COMMERCIAL TERMS

The numbers,
before you ask.

These are the terms quotations are written against. Anything outside them is stated on the quotation rather than discovered later.

Pricing currency

USD

Incoterms

EXW, FOB, CIF, DDP

Payment terms

Discussed per project and confirmed on the order

MOQ

1 piece, no tooling charge

Prototype lead time

10–15 days from approved drawings

Production lead time

20–40 days after first-off approval

Quality system

ISO 9001

Reply time

Within 2 hours on average, working days in China

Batch of identical powder-coated enclosure parts stacked on a pallet with an inspection tag

AFTER THE FIRST ORDER

The second batch
is the real test.

Anyone can get a prototype right. What matters is whether the tenth batch is identical to the approved sample, and whether a design change is handled cleanly when your product evolves.

The approved drawing and the first-off inspection report stay with the project. Every subsequent batch is measured against that reference rather than against the previous batch, which is how drift creeps in elsewhere.

When the design changes, the drawing is revised and a new first-off sample is produced against it. We do not run a batch against a drawing that has moved without confirming the change first.

Spare parts, replacement doors and additional panels ordered later are built to the same reference, so a unit delivered two years apart still fits.

READY WHEN YOU ARE

Let’s talk about
your next build.

Send your drawings, a reference photo or a few project notes. Engineering returns a manufacturability review with the quotation — before you commit to production.