Covered by certification
Document control, process inspection, corrective action, traceability and internal audit.
Request a quote ↗QUALITY & CERTIFICATION
A certificate tells you a system exists. It does not tell you whether the opening on the panel you just received is the size the drawing says. This page is about the second thing: the measurements, the reports and what happens when something is wrong.
ISO 9001 · CE conformity · SGS audited · Alibaba 5.0/5

WHAT A CERTIFICATE DOES AND DOES NOT PROVE
ISO 9001 certifies that a documented quality system is in place and audited. It does not certify that any individual part is correct. Those are two different claims, and buyers who treat them as the same thing end up discovering the gap at incoming inspection.
So both exist here. The system is what the certificates cover. The dimensional report, the material certificates and the first-off report are what actually tell you about the parts in the crate.
Where a claim cannot be backed by a document, we would rather not make it. If a project needs a specific test — a salt-spray cycle, a protection rating verified by a third party, a CMM report — say so in the RFQ and it is quoted as a separate, named scope.
Covered by certification
Document control, process inspection, corrective action, traceability and internal audit.
Covered by the documentation pack
The measured dimensions on your parts, the grades actually used, and the first-off sample you signed.
Quoted separately when needed
Salt spray, IP or NEMA verification by a third party, CMM reports, and witnessed inspection.
CERTIFICATION & AUDIT
Certificates, audit reports and inspection reports are available with your quotation on request. Nothing here needs to be taken on trust — ask for the document.

01 / SYSTEM
Quality management system covering drawing control, process inspection, corrective action and internal audit.
What it means for you: a documented route exists for a non-conformance, so a problem has a defined process rather than an improvised apology.
02 / PRODUCT
CE conformity documentation for supplied products where the project requires it.
What it means for you: the documentation needed to place the product on the EU market can be supplied with the order rather than requested afterwards.
03 / FACTORY
The factory has been audited in person by SGS. The audit report can be shared before you place an order.
What it means for you: an independent party has physically walked the factory — useful when you cannot visit before ordering.
04 / TRADE
Verified Alibaba International supplier with a 5.0 / 5 customer rating and seven years of export orders.
What it means for you: a track history you can check independently of anything on this page.
INSPECTION FLOW
Inspection is part of the production route, not a final hurdle you have to argue for. Each checkpoint states what it exists to catch.
01
Steel plate and hardware are checked on arrival against the grade and thickness specified. Material test certificates are kept on file and travel with the order.
Caught here: wrong grade, wrong thickness, damaged plate
02
The first part off each setup is measured against the approved drawing and held until you sign it off. It becomes the reference the run is measured against — not the previous batch.
Caught here: a setup that is out, before the run starts
03
Bend angles, weld quality and coating thickness are checked as the batch progresses through cutting, forming, welding and finishing.
Caught here: drift part-way through a batch
04
Key dimensions inspected against the approved drawing, plus visual and coating checks. Reports and material traceability archived and issued before dispatch.
Caught here: anything that survived the earlier checkpoints

CHECKPOINT 01 / INCOMING
Material substitution is the quietest failure in this industry. The part looks right, the coating goes on, and the corrosion problem appears eighteen months later at the coast.
So incoming material is verified physically: grade marking checked, thickness measured, and the material test certificate kept against the batch. Where the project requires it, the certificate number is recorded on the inspection report so a future part can be traced back to the same heat.
This is also the checkpoint where a damaged or wrong-gauge steel plate is caught before it costs a cutting cycle and a scrapped part.
CHECKPOINT 03 / IN-PROCESS
A press brake does not fail suddenly. It drifts — a fraction of a degree at a time, until the fiftieth part no longer closes on the frame. Checking only at the end means scrapping the whole run instead of correcting the setup.
Bend angles, weld quality and coating thickness are checked as the batch progresses. On a repeat order the check is against the first-off reference rather than against the previous batch, which is how tolerance creeps in elsewhere.
Coating thickness is measured rather than assumed, because powder build-up is the difference between a finish that survives five years outdoors and one that chips at the first knock.

WHAT SHIPS WITH THE PALLET
Instead of comparing the goods to a memory of a conversation, your inspector compares them to a document with measured values in it. That is the difference between an opinion and an acceptance decision.
Reports are archived by project, so a replacement part ordered two years later can be built and inspected against the same reference as the original.

The measured values for the dimensions agreed as critical, against the approved drawing.
Test certificates for the grades actually used, traceable to the batch.
Issued for export, on the country-of-origin basis your customs broker needs.
The signed sample reference the run was measured against.
Of the finished parts, where the project asks for them or where a visual reference is useful for remote approval.
Where the finish specification calls for measured values rather than a visual check.
EQUIPMENT & CAPACITY
Cutting, forming, welding, finishing, assembly and inspection all run under one roof in Dongguan, so the tolerance is held by the same team from first-off sample to repeat order.
01 / CUTTING
±0.01 mm positioning accuracy. The pair is redundant, so maintenance on one machine does not stop your order.
02 / FORMING
Press-brake forming and turret punching for cabinet bodies, panels, brackets and chassis.
03 / JOINING
Laser welding for low-distortion precision seams; TIG and MIG where structural strength governs.
04 / FINISHING
Deburring, pretreatment and powder coating on our own line; other finishes arranged per project.
05 / MACHINING
Milling, drilling and tapping for finished features on sheet metal parts and assemblies.
06 / CAPACITY
2,000 m² of production area and 20 people, including four engineers and a dedicated QA team.

The workshop the figures above refer to: 2,000 m² in Dongguan.
WHEN SOMETHING IS WRONG
Every supplier claims good quality. The useful question is what happens on the day a part is wrong, and whether that process is defined before it is needed.
01
Send pictures of the part, the packing and the label, plus the dimension you measured and the value you expected. That is usually enough to identify whether it is a build error, a drawing ambiguity or transit damage.
02
The inspection report and the approved drawing for your order are retrieved. If the parts were built to the approved reference, the conversation is about the drawing. If they were not, it is our problem.
03
Remake, credit or rework, stated before anything ships. Where a remake is the answer, it is prioritised rather than queued behind new orders.
AGREE THESE FIRST
These are settled at drawing review, before the parts exist. Left until delivery, they become a negotiation instead of a check.
Mark the dimensions you will actually measure on receipt. Inspection criteria are agreed against those, not against every dimension on the drawing.
Say which faces are judged cosmetically. Weld finishing and coating consistency are specified for those specifically.
A dimensional report is standard. Photographs, per-batch logs or third-party witnessing are added where the project needs them.
Tolerances, finish and function agreed before the run, so a first-off decision is a comparison rather than an opinion.
THIRD-PARTY INSPECTION
SGS, BV, TÜV, Intertek or your own nominated inspector — at your cost and on your schedule. Name it in the RFQ and it is built into the production plan rather than arranged after the fact.
The most useful moment for a third party is the first-off sample, before the batch runs. A pre-shipment inspection catches what is left; a first-off inspection prevents it.
Where an inspector needs fixtures, a particular measurement method or a documented sampling plan, tell us with the RFQ so the parts are held and presented correctly.
READY WHEN YOU ARE
Tell us what your incoming inspection needs to see and we will say what can be provided before you order.
SEND DRAWINGS
Share the drawings or the dimensions you have. Engineering reviews them and returns the findings with the quotation — usually within one working day.