OEM sheet metal manufacturing · Dongguan, Chinasales01@xinghaoxin.comTalk to our team ↗
Industrial Control Cabinets
CUSTOM XHX ENCLOSURE

Industrial Control Cabinets

Control cabinet builds with panel, mounting, access and cable-entry details built in.

  • Free DFM review
  • From 1 piece
  • ISO 9001 quality system
  • Quote with findings

Built to your drawings · OEM / ODM · Dongguan, China

INDUSTRIAL CONTROL CABINETS

Judged during
commissioning.

A control cabinet is not judged on the loading dock. It is judged on the day the panel is wired, the day the machine is commissioned, and every time somebody has to open it with a laptop in one hand. Those three moments decide whether the enclosure was designed properly.

The cabinet is part of the machine

A control cabinet holds the PLC, variable-frequency drives, terminals and safety gear that run a process. Its internal layout is dictated by the schematic, and its external arrangement is dictated by where an operator stands and where a cable tray arrives. Both have to be right at the same time.

Commissioning is the test

During commissioning the cabinet is open for hours at a time while somebody works inside it. Door geometry, mounting plate depth, working clearance and lighting all matter then. We design around that moment because it is when a badly laid out cabinet becomes expensive.

Built to be repeated

Most control cabinets are bought in series, one per machine. The first one is measured against the drawing and against the fit; the approved drawing becomes the reference for every subsequent unit, so machine five is identical to machine one.

Industrial control cabinet with DIN rail components

MATERIAL SELECTION

Choosing the material
for the real exposure.

The grade is decided by where the enclosure lives and how it is cleaned — not by what is cheapest on the day.

Cold-rolled steel with powder coat

The default for machine control: dimensionally stable, easy to form accurately, and available in the RAL colour that matches the machine. Interior is normally a light colour so wiring is visible under poor light.

Best for: machine control, PLC panels, drive cabinets

Galvanized steel

Used where the panel will be drilled for cable entries during installation and cut edges need protection, or where the machine environment is damp.

Best for: damp machine areas, field-modified panels

304 stainless

Specified for food, beverage and pharmaceutical machinery where the cabinet is washed down with the rest of the line. Welded and finished rather than riveted, and normally supplied brushed.

Best for: food, beverage, pharma machinery

Aluminium sub-panels

Often used for the internal mounting plate where weight or drilling convenience matters, even when the outer cabinet is steel. It saves weight and makes on-site modifications easier.

Best for: large mounting plates, field-modified panels

Control cabinet beside a production line

From the workshop — the same drawing-led process on every build.

WHERE IT IS INSTALLED

Applications and
what drives each one.

The same product behaves differently depending on where it goes. These are the installations we build for and the constraint that shapes each.

01

Production line machine control

A cabinet bolted to or standing beside a machine, positioned so the operator can reach the HMI and the maintenance technician can open the door fully. Door swing and HMI cutout are the two details that cause the most installation problems.

02

Process industry control rooms

Rows of cabinets in a controlled environment, where the constraints are cable routing, heat load in a closed room, and consistent appearance across the row.

03

Packaging and handling equipment

Cabinets on machines that vibrate and are washed around. Mounting and door hardware are specified for vibration, and the finish is specified for the cleaning chemicals used.

04

Water and environmental facilities

Outdoor-adjacent control cabinets in damp, sometimes corrosive facility, where the enclosure often moves up to stainless and the internal layout has to allow for condensation management.

QUESTIONS

What buyers ask
about this product.

Can you assemble the cabinet with our components?

Yes. Send the components or have them shipped to us and we assemble to your drawing. Alternatively we supply the shell and you fit out during installation — both are normal.

Do you work from a schematic or a 3D model?

Either. A schematic plus overall dimensions is enough to start. A 3D model lets us check clearances faster and reduces the questions we have to come back with.

How do you handle cable entry alignment with the tray?

Give us the tray route and cable schedule and the cable entry plate is positioned to match. If the tray is not decided yet we leave the plate undrilled so it can be cut during installation.

Can the cabinet match our machine colour?

Yes — give us the RAL reference and the powder coat is matched to it. Send a physical sample if the colour is critical.

What is the lead time for a control cabinet?

Prototype 10–15 days from approved drawings; repeat production 20–40 days depending on quantity, finishing and assembly scope.

START A PROJECT

Send the drawing.
Get the findings back.

Engineering reviews manufacturability and returns the open questions with the quotation — before you commit to production.